Saturday May 30th, 2026
CoD Warzone
I was responsible for the overall core hexagonal structure (both exterior and interior) of the bunker within the stadium, which includes assigning ceiling, wall and floor materials as well as and doing some internal dressing in the form of wall monitors, electrical panels / conduit circuits, hanging cables, light switches, storage containers, wire spool, dolly and junction boxes. I also did the complete bunker exterior dressing including debris, light fixtures, access panels and damaged stadium ceiling support beams. All assets reuse existing ones.